Last edited by Arazshura
Wednesday, July 29, 2020 | History

3 edition of Estimating pressurized water reactor decommissioning costs found in the catalog.

Estimating pressurized water reactor decommissioning costs

Estimating pressurized water reactor decommissioning costs

a user"s manual for the PWR cost estimating computer program (CECP) software : final report

  • 247 Want to read
  • 7 Currently reading

Published by Division of Regulatory Applications, Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission, Supt. of Docs., U.S. G.P.O. [distributor] in Washington, DC .
Written in

    Subjects:
  • Pressurized water reactors -- Computer programs -- Handbooks, manuals, etc.,
  • Pressurized water reactors -- Costs -- Computer programs -- Handbooks, manuals, etc.,
  • Nuclear reactors -- Decommissioning -- Computer programs -- Handbooks, manuals, etc.,
  • Nuclear reactors -- Decommissioning -- Costs -- Computer programs -- Handbooks, manuals, etc.

  • Edition Notes

    Other titlesPWR cost estimating computer program.
    Statementprepared by M.C. Bierschbach.
    ContributionsU.S. Nuclear Regulatory Commission. Office of Nuclear Regulatory Research. Division of Regulatory Applications., Pacific Northwest Laboratory.
    The Physical Object
    FormatMicroform
    Pagination1 v. (various pagings)
    ID Numbers
    Open LibraryOL15418074M

    CECP (PWR): Estimating Pressurized Water Reactor Decommissioning Costs. 2. CONTRIBUTOR. Pacific Northwest National Laboratory, Richland, Washington. 3. CODING LANGUAGE AND . Get this from a library! Technology, safety, and costs of decommissioning a reference pressurized water reactor power station: technical support for decommissioning matters related to preparation of the final decommissioning .

    Decommissioning the Blurb. formula for estimating decommissioning costs for reactor plants different in size from the reference boiling water reactor (BWR) described in the earlier study; and.   Basic Facts: Location: Crystal River, Florida Owner: Duke Energy Operator: Duke Energy Construction Cost: $B ($) Plant Output: MW Property Size: 4, acres Status: SAFSTOR Current DTF Balance: $M ($) Decommissioning Completion Estimate: $M ($) Spent Nuclear Fuel On Site: metric tons Background The Crystal River Nuclear Plant (CR3) was an megawatt pressurized.

    @article{osti_, title = {Technology, safety, and costs of decommissioning a reference pressurized water reactor power station}, author = {Smith, R I and Konzek, G J and Kennedy, Jr, W E}, abstractNote = {Safety and cost information was developed for the conceptual decommissioning of a large ( MW(e)) pressurized water reactor . Additional analyses of decommissioning of the reference pressurized water reactor (PWR) power station are made that examine some parameters not covered in the initial study report (NUREG/CR). The parameters examined are: (1) the effect of plant size on costs Cited by:


Share this book
You might also like

outline of spychiatry for students and practitioners

Nutrition in a nutshell.

An introduction to the new astrology

Hobomok

Beverly Hills 90210

Lesson drawn from the crisis development in the party and society after the 13th Congress of the Communist Party of Czechoslovakia.

guardians of La Loma

Genesis and evolution of La Violencia in Antioquia, Colombia (1900-1953)

Timpetill, a story for children

The Water Crisis

Scholarships and fellowships

Arne Jacobsen

Review of the delivery of health services for improving integrated services including family planning and maternal child health

History of Burlington and Mercer counties, New Jersey

Estimating pressurized water reactor decommissioning costs Download PDF EPUB FB2

Estimating pressurized water reactor decommissioning costs a user's manual for the PWR cost estimating computer program (CECP) software: final report (SuDoc Y 3.N //FINAL) [Bierschbach, M.

C.] on *FREE* shipping on qualifying offers. Estimating pressurized water reactor decommissioning costs a user's manual for the PWR cost estimating Author: M. Bierschbach.

@article{osti_, title = {Estimating pressurized water reactor decommissioning costs: A user`s manual for the PWR Cost Estimating Computer Program (CECP) software. Draft report for comment}, author = {Bierschbach, M C and Mencinsky, G J}, abstractNote = {With the issuance of the Decommissioning.

Technology, safety and costs of decommissioning a reference pressurized water reactor power station: Addendum (NUREG/CR) Unknown Binding – January 1, by R.

I Smith (Author) See all formats and editions Hide other formats and editions. The Amazon Book Review Author interviews, book Author: R. I Smith. The SRP includes guidance on evaluating decommissioning costs for both pressurized water reactors (PWRs) and boiling water reactors (BWRs).

The SRP is divided into sections that are keyed to the sections in Regulatory Guide, "Standard Format and Content of Decommissioning Cost Estimates for Nuclear Power Reactors.

The unit decommissioning cost is need-ed to make an estimation of the total de-commissioning cost of a nuclear power re-actor. Therefore, the worldwide decom-missioning experience data for PWRs (Pressurized Water Reactors) and PHWRs (Pressurized Heavy Water Reactor) [3] was used.

According to reference [3], the mean decommissioning cost. Site-Specific Decommissioning Cost Estimate Page viii of xx TLG Services, Inc.

material. Inthe Commission directed its staff to re-evaluate this alternative and identify the technical requirements. ORGANISATION FOR ECONOMIC CO- OPERATION AND DEVELOPMENT The OECD is a unique forum where the governments of 34 democracies work together to address the economic, social and File Size: 1MB.

The most common type of nuclear power reactor is the pressurized water reactor (Figure 2). In this type, heat generated by radioactive uranium fuel inside the reactor vessel is taken up by water and File Size: KB.

ADDRESSING UNCERTAINTIES IN COST ESTIMATES FOR DECOMMISSIONING NUCLEAR FACILITIES, NEA No ADDRESSING UNCERTAINTIES IN COST ESTIMATES FOR DECOMMISSIONING NUCLEAR FACILITIES, NEA ACM Asbestos-containing materials BoE Basis of estimate BWR Boiling water reactors DRiMa Project on Decommissioning File Size: 2MB.

UKCS Decommissioning - Cost Estimate Report. (UKCS) has reduced from last year’s baseline, as detailed in the report 'UKCS Decommissioning - Cost Estimate Report' With a shared objective of industry and government to reduce decommissioning costs. The Cost Estimating Computer Program CECP, designed for use on an IBM personal computer or equivalent, was developed for estimating the cost of decommissioning boiling water reactor (BWR) and light-water reactor.

Technology, safety and costs of decommissioning a reference pressurized water reactor power station Nuclear Regulatory Commission, Office of Standards Development, Division of Engineering.

Cost Estimation for Research Reactor Decommissioning No. NW-T Cost Estimation for Research Reactor Decommissioning IAEA Nuclear Energy Series No.

NW-T. These guidelines were prepared for decommissioning commercial nuclear power reactors of the pressurized water reactor and boiling water reactor types. Chapter 1 define the purpose and scope of the document and discusses the general approach, i.e., elements of decommissioning costs and cost estimating.

@article{osti_, title = {Technology, safety and costs of decommissioning a Reference Boiling Water Reactor Power Station. Main report. Volume 1}, author = {Oak, H D and Holter, G M and Kennedy, Jr, W E and Konzek, G J}, abstractNote = {Technology, safety and cost information is given for the conceptual decommissioning of a large (MWe) boiling water reactor.

M.C. BIERSCHBACH, “ Estimating Pressurized Water Reactor Decommissioni ng Costs, A User’s Manual for the PWR Cost Estimating C omputer Program (CECP) Software, Draft. Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities: NUREG, Revision 14 [NRC Staff: United States Nuclear Regulat] on *FREE* shipping on qualifying offers.

A requirement placed upon nuclear power reactor licensees by the U.S. Nuclear Regulatory Commission (NRC) is that licensees must annually adjust the estimate. "Revised Analyses of Decommissioning for the Reference Pressurized Water Reactor Power Station," Volumes 1 and 2, November ADAMS Accession No.

ML A — NUREG/CR, "Revised Analyses of Decommissioning for the Reference Boiling Water Reactor. Decommissioning Methodology and Cost Evaluation BPA No. E13PA Call Order No. E14PB Prepared for U.S.

Department of the Interior Bureau of Safety and Environmental. Get this from a library. Estimating pressurized water reactor decommissioning costs: a user's manual for the PWR cost estimating computer program (CECP) software: final report.

[M C. Get this from a library! Estimating pressurized water reactor decommissioning costs: a user's manual for the PWR cost estimating computer program (CECP) software: draft report for comment.

.Abstract. Decommissioning is a series of measures taken after the main activities associated with a licensed activity or reactor have been terminated and before the regulations set forth in the Act on the Regulation of Nuclear Source Material, Nuclear Fuel Material and Reactors [1] (hereinafter referred to as “Reactor Cited by: 6.

This report presents the results of a review and reevaluation of the PNL decommissioning study of the Washington Public Power Supply System's Washington Nuclear Plant Two (WNP-2), which is a boiling water reactor (BWR), located at Richland, Washington, including all identifiable factors and cost .